The Oak Brook Project – Demo!

Integro - Blog - Oak Brook Demo (1)

We are full throttle in Oak Brook – that’s right! Sledgehammers everywhere, debris hauling, and endless pizza.

1 Front Exterior - Before
Front Exterior – Before

So, the demo truck was out of commission and – being the brilliant minds that we are – we decided that, to make things easy, we would just bring in a dumpster. I’d link to all the posts where I’ve ranted about how dumpsters are the bane of my existence (only surpassed by stairs) except that we’d have 20 links here and it’d look like I was trying to compensate for something (which I am). Regardless, this seemed like a great idea about a week ago. We lay six sheets of plywood on the driveway for protection. The dumpster comes, we fill it with stuff!

IMG_2196

Then, it doesn’t leave. One day, two days…things are piling up in the garage…it’s raining…Finally! Here they come with a new dumpster! They begin to remove the existing dumpster and we notice that the tension belt is loose – then the yelling begins as the dumpster starts dragging the plywood. This went on for about 5 seconds before the dumpster then snaps loose and drops onto the driveway.

IMG_2201

Did I mention that I hate dumpsters?

Scope Addition: Repair Driveway

In the meantime, we are focusing on our way-finding:

IMG_2183 IMG_2184 IMG_2185 IMG_2193

Also, our removal of Roman Baths:

…and now we’re ready for framing!

 

Not bad for one week, eh?

Want to see more projects? Check us out at Integro Rehab!

Advertisements

One thought on “The Oak Brook Project – Demo!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s